Originally reported November 8, 2026, at 20:07 UTC+8. The dates below were upcoming at the time of the original report; this is not a confirmation that each event occurred.
Which events change token supply, and which change how a network or service works? Seven scheduled unlocks add tokens to the available supply, while the other dates concern launches, migrations or service changes. The unlock figures and estimated values below are those reported on November 8, not current valuations.
| Scheduled unlock (Beijing time) | Token | Approximate amount | Ratio to circulating supply | Estimated value |
|---|---|---|---|---|
| Nov. 11, 21:00 | Allora (ALLO) | 160 million | 65.56% | $23.7 million |
| Nov. 11, 14:00 | Aptos (APT) | 4.54 million | 0.51% | $2.7 million |
| Nov. 12, 08:00 | peaq (PEAQ) | 82.21 million | 3.07% | $2.4 million |
| Nov. 13, 08:00 | Aztec (AZTEC) | 797 million | 31.81% | $10.3 million |
| Nov. 14, 11:00 | YZY (YZY) | 29.17 million | 4.12% | $8.4 million |
| Nov. 15, 08:00 | Starknet (STRK) | 127 million | 3.26% | $5 million |
| Nov. 15, 20:00 | Sei (SEI) | 55.56 million | 0.83% | $2.5 million |
The ratios compare each unlock with its token’s circulating supply; they are not percentages of total supply. An unlock schedule alone does not establish when recipients will sell.
Network and service dates
- Nov. 9 — Elysium: The Hyperliquid-ecosystem L2 planned to launch its mainnet. Its stated architecture uses HyperEVM for settlement alongside HyperCore, with HYPE as its native gas token. That is a network launch, not a reported HYPE unlock.
- Nov. 9 — Polymarket Protocol V2: Developers moved the planned release from November 2 to November 9. They said the precise deployment time and market-migration order would follow; users did not need to act in the meantime.
- Nov. 12 — Blur and Blend: Blur said it would retire the blur.io front end while its marketplace protocol continued to run on-chain and BLUR continued to control the fee switch. Blend was to stop matching new loans the same day. A front-end retirement is therefore distinct from shutting down the on-chain marketplace.
- Nov. 13 onward — Kaia staking migration: Kaia planned to publish instructions on November 13 for moving KAIA in public delegation to new staking contracts. Staked tokens would not move automatically: users would need to request withdrawal, wait seven days, withdraw and deposit into the new contract. The portal was scheduled to accept withdrawal requests from November 17 and enable withdrawals and redeposits from November 26.
Source: panewslab.com (originally published 2026-11-08 20:07 UTC+8)
